Points for attention in using lifting hoist in stage construction

Read:265    Time:2022-08-31


What should our staff pay attention to before, during and after the use of the stage electric hoist? Today, the editor of Hebei Dingyou Crane Machinery Manufacturing Co., Ltd. will give you an analysis to make our equipment safer and more durable.

When the stage hoist needs to be used for stage construction, the stage hoist should be checked to see if it is in good condition, and then it can be tested simply by idling several times to see if it is in normal operation. However, during the test, it is not allowed to power on for inspection to avoid accidents caused by sudden operation.

After ten minutes in the air, if everything is normal, the goods should be lifted up and down repeatedly. The purpose of this is to check whether all parts of the stage electric hoist work normally.

Electric hoists that repeatedly lift up and down for light lifting are also required. For example, the rated closing times of goods exceeding the rated load should not exceed 120 per hour to avoid accidents.

At the same time, we should also check whether the various devices of the stage hoist work flexibly to avoid jamming. In addition, the distance between the hook of the hoist and the drum shell during the lifting process shall not be less than 50mm, and the distance between the hoist of different lifting tonnage is different. After the stage hoist is used, turn off the power supply in time to avoid human factors from suddenly turning on the power supply, and the hoist will work automatically, causing damage.